BLACK BART EROSION CONTROL PROJECT, PHASE 2
Summary
SCH Number
1996103236
Lead Agency
California Tahoe Conservancy
Document Title
BLACK BART EROSION CONTROL PROJECT, PHASE 2
Document Type
NOD - Notice of Determination
Received
Posted
3/28/1996
Document Description
THIS PROJECT INVOLVES THE REPLACEMENT OF THE EXISTING TROUT CREEEK CULVERT UNDER MARTIN AVENUE, THE CONSTRUCTION OF ROADWAY DRAINAGE IMPROVEMENTS, AND ROADWAY WIDENING AND INSTALLATION OF GUARDRAIL AT THE CREEK CROSSING. THE THE PROJECT IS INTENDED TO IMPROVE THE WATER QUALITY OF STORMWATER DISCHARGING TO TROUT CREEK, AND WILL ALSO IMPROVE ROADWAY SAFETY.
Contact Information
Name
MARJI FELIZ
Agency Name
CA TAHOE CONSERVANCY
Contact Types
Lead/Public Agency
Phone
Location
Cities
South Lake Tahoe
Counties
El Dorado
Notice of Determination
Approving Agency
N/A
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.