Caltrans D6 Issuance Encroachment Permit for CHSR Proj. - SR43/Ave 120 PG&E Relocation
    132 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                    
                        
                
                    
                    
                                    
                        
                                    
                        
            
        
    
        
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
                Summary
                SCH Number
            
            
                2009091125
            
        
                    Lead Agency
            
            
                California High Speed Rail Authority
                
            
        
                Document Title
            
            Caltrans D6 Issuance Encroachment Permit for CHSR Proj. - SR43/Ave 120 PG&E Relocation
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    12/6/2022
                
            
                Document Description
            
            Site 1 (SR43 TUL 17.457): Remove existing overhead PG&E conductor spans across SR43. Site 2 (SR43 TUL 17.049): Jack and Bore 115 feet across SR43. Site 3 (SR43 TUL 17.108-17.049): Remove existing overhead PG&E conductor spans and poles across Ave 120 and SR43. Site 4 (SR43 TUL 17.108-17.049): Horizontal Directional Drill (HDD) across Ave 120 and trench to install 2-6" and 1-4" conduits. Shoulder closure on the East side of SR43 for trenching/HDD work.
        Contact Information
                        Name
                    
                    
                        Haesun Lim
                    
                
                        Agency Name
                    
                    
                        California Department of Transportation
                    
                
                            Job Title
                        
                        
                            Senior Environmental Planner
                        
                    
                        Contact Types
                    
                    
                        Responsible Agency
                    
                
                            Phone
                        
                        
                    
                            Email
                        
                        
                    Location
                    Counties
                
                Tulare
            
                    Regions
                
                Statewide
            
                    Cross Streets
                
                
                    SR43 and Ave 120
                
            Notice of Determination
                        Approving Agency
                    
                    
                        California Department of Transportation
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            Yes
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            Yes
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            Yes
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    