Diversion Dam Maintenance Dredging Project, Rio Bravo Hydroelectric Project
    3 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                    
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2013071029
            
        
                    Lead Agency
            
            
                Olcese Water District
                
            
        
                Document Title
            
            Diversion Dam Maintenance Dredging Project, Rio Bravo Hydroelectric Project
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    8/14/2013
                
            
                    Present Land Use
                
                
                    Open Space - Resource Mgmt Area (Agriculture, Flood Plain); Open Space - Slopes Exceeding 30% Suburban Residential; Low Density
                
            
                Document Description
            
            Maintenance dredging is proposed to remove the sands and sediment that have accumulated from the hydroelectric projects discharges upstream of the project.  The proposed project is located on private lands in Kern County, approximately 15 miles northeast of the Bakersfield downtown area.  Project lands on the south side of the Kern River are located within the Bakersfield city limits, whereas lands on the north side of river are in Kern County.  The purpose of the proposed maintenance dredging is to remove accumulated sediment from the project reservoir to restore operational capacity and reduce operation and maintenance costs.  Approximately 35,000-40,000 yd3 of sediment would be removed.  The maintenance dredging will have to be done in low flow conditions, October through January in a normal year.
        Contact Information
                        Name
                    
                    
                        James L. Nickel
                    
                
                        Agency Name
                    
                    
                        Olcese Water District
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                Bakersfield
            
                    Counties
                
                Kern
            
                    Zip
                
                
                    93306
                
            
                    Total Acres
                
                
                    15.5
                
            
                    Parcel #
                
                
                    397-02-023
                
            
                    State Highways
                
                
                    Hwy 178
                
            
                    Waterways
                
                
                    Kern River
                
            Notice of Determination
                        Approving Agency
                    
                    
                        Oicese Water District                                           
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
