Water-Use and Irrigation Efficiency Project
    2 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                
                    
        
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2013081018
            
        
                    Lead Agency
            
            
                Buena Vista Water Storage District
                
            
        
                Document Title
            
            Water-Use and Irrigation Efficiency Project
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    9/25/2013
                
            
                    Present Land Use
                
                
                    Various
                
            
                Document Description
            
            The Water-Use and irrigation Efficiency Project (the Project) consists of three project components, which are:
*Elk Reserve Turnouts 
*West Side Canal Lining
*Semitropic Pipeline Turnout
The Elk Reserve Turnouts consist of constructing three turnout connections along the eastern side of the East Side Canal to provide water to the Tule Elk State Natural Reserve. The three turnouts are termed the SWP BV2 Turnout, the Well 2 Turnout, and the Booster Pump Turnout.
The District's West Side Canal Lining consists of constructing and operating a turnout from Semitropic Water Storage District's existing ten-foot diameter pipeline (referred to as the Semitropic Pipeline) to the West Side Canal. Operation of the Semitropic Pipeline Turnout will eliminate the need for District use of up to 2.5 miles of the West Side Canal, thus reducing water seepage and evaporation over that length of the West Side Canal. 
        Contact Information
                        Name
                    
                    
                        Tim Ashlock
                    
                
                        Agency Name
                    
                    
                        Buena Vista Water Storage District
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                        Coordinates
                    
                    
                
                    Counties
                
                Kern
            
                    Zip
                
                
                    93206
                
            
                    State Highways
                
                
                    I-5
                
            
                    Railways
                
                
                    No
                
            
                    Airports
                
                
                    Elk Hills-Buttonwillow
                
            
                    Schools
                
                
                    No
                
            
                    Waterways
                
                
                    Numerous
                
            
                    Other Location Info
                
                
                    Buttonwillow
                
            Notice of Determination
                        Approving Agency
                    
                    
                        Buena Vista Water Storage District                              
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
