Embarcadero-Potrero 230 kV Transmission Project
    2 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                    
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2013082047
            
        
                    Lead Agency
            
            
                California Public Utilities Commission
                (CPUC)
            
        
                Document Title
            
            Embarcadero-Potrero 230 kV Transmission Project
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    1/21/2014
                
            
                    Present Land Use
                
                
                    Urban and within San Francisco Bay/Residential, Resid. Mixed Use, Resid.-Commercial, Light Industrial and Heavy Industrial
                
            
                Document Description
            
            The project consists of construction a new 3.5 mile 230 kV transmission line from Embarcadero Substation near the corner of Fremont and Folsom Streets, to Potrero Switchyard on Illinois Street between 22nd and 23rd Streets.  Approximately 2.5 miles would be installed offshore underneath the seafloor of San Francisco Bay, 0.4 mile would be installed using horizontal directional drills between onshore transition points and the bay, and ~0.6 mile would be installed underground in paved areas, including Spear St. and Folsom St. in the Rincon Hill neighborhood and 23rd Street east of Illinois St. Construction of a new 230 kV switchyard would occur near the existing Potrero Switchyard, but no new substation work is proposed to occur at the existing Embarcadero Substation beyond the proposed termination of the new cable into 230 kV bus.
        Contact Information
                        Name
                    
                    
                        Billie Blanchard
                    
                
                        Agency Name
                    
                    
                        California Public Utilities Commission
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Cities
                
                San Francisco
            
                    Counties
                
                San Francisco
            
                    Cross Streets
                
                
                    Folsom St., Spear St., The Embarcadero, Illinois St., 23rd St.
                
            
                    Zip
                
                
                    94105,9410
                
            
                    Total Acres
                
                
                    linear 3.5 mi.
                
            
                    State Highways
                
                
                    I-80, I-280, Hwy 101
                
            
                    Railways
                
                
                    Caltrain
                
            
                    Schools
                
                
                    Marin Day School
                
            
                    Waterways
                
                
                    San Francisco Bay
                
            Notice of Determination
                        Approving Agency
                    
                    
                        CA PUC                                                          
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        