Michael Mayes Land Division project; Agreement 2013-0096-R4
Summary
                SCH Number
            
            
                2013099017
            
        
                    Lead Agency
            
            
                California Department of Fish and Wildlife, Region 4
                (CDFW)
            
        
                Document Title
            
            Michael Mayes Land Division project; Agreement 2013-0096-R4
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    9/16/2013
                
            
                Document Description
            
            The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Michael Mayes. The Project includes the construction of a rural road over a seasonal tributary to Ownes Creek. The road will be constructed over two parallel 65-foot by 40--foot arched, corrugated steel pipes, approximately 35 feet in length. Approximately 3 cubic yards of material will be excavated from the streambed and banks in order to install the culverts. Approximately 250 cubic yards of fill will be placed on and around the culverts to construct the road base and driving surface. At the upstream end of the culverts there a precast concrete headwall will be installed. At the downstream end, each culvert will be fitted with a flared outlet and rip rap apron, consisting of approximately 16 cubic yards of 12 inch diameter D50 rock, placed over filter fabric.
        Contact Information
                        Name
                    
                    
                        Sarah Paulson
                    
                
                        Agency Name
                    
                    
                        California Department of Fish and Wildlife, Region 4
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                    Counties
                
                Mariposa
            Notice of Determination
                        Approving Agency
                    
                    
                        California Department of Fish and Wildlife                      
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
