Griffith Park Water Recycling Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8200-110
    4 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                    
                
        
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
    
                
                    
                    
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
    
                Summary
                SCH Number
            
            
                2013101066
            
        
                    Lead Agency
            
            
                Los Angeles Department of Water and Power
                
            
        
                Document Title
            
            Griffith Park Water Recycling Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-8200-110
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    4/28/2017
                
            
                    Present Land Use
                
                
                    Open Space (OS-1XL)
                
            
                Document Description
            
            The proposed project would begin at the existing Greenbelt Water Recycling pipeline 2,040 linear feet pipeline would connect to an existing recycled water pipeline.  The pipeline would connect to a new pump station.  From the pump station, the pipeline would continue for 2,830 feet.  Approx. 1,400 linear pipeline would be constructed from the HOD receiving pit to a new recycled water storage tank, to be located southeast of existing Tank 114.  The existing service main for the Roosevelt Golf Course would be split into two separate pipelines.  A new ductile iron pipeline would be connected to the downstream portion of the pipeline and extend approx. 700 linear feet to the new recycled water storage tank.  A new steel pipeline would connect to the upstream portion and extend approx. 700 linear feet to the proposed recycled water storage tank.  A recycled water pump station would be located within the City easement.  The proposed pump station would consist of two operating pumps and one back-up pump.  The recycled water storage tank would replace the existing steel Tank 114.  The existing Tank 114 would be demolished and aboveground appurtenances removed.  The proposed recycled water storage tank would also have a potable water back-up supplied from the existing potable water system.  Appurtenant facilities such as values, vaults, air gaps, flow meters, discharge system would also include disinfection monitoring systems, a corrosion control system, provisions for water treatment, and provisions for security standards.
        Contact Information
                        Name
                    
                    
                        Trevor Cleak
                    
                
                        Agency Name
                    
                    
                        SWRCB
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    Location
                        Coordinates
                    
                    
                
                    Cities
                
                Los Angeles, Los Angeles, City of
            
                    Counties
                
                Los Angeles
            
                    Cross Streets
                
                
                    Crystal Springs Drive, Fire Road, Griffith Park Drive, Vista Del Valle Drive
                
            
                    Zip
                
                
                    90027
                
            
                    Total Acres
                
                
                    5.8
                
            
                    Parcel #
                
                
                    5593002906, 5593002905
                
            
                    State Highways
                
                
                    Hwy 5, 134
                
            
                    Railways
                
                
                    Metrolink / Amtrak
                
            
                    Schools
                
                
                    Los Feliz Nursery School and John Marshall HS
                
            
                    Waterways
                
                
                    Los Angeles River
                
            Notice of Determination
                        Approving Agency
                    
                    
                        State Water Board                                               
                    
                
                            Approving Agency Role
                        
                        
                            Responsible Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            N/A
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            N/A
                        
                    Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.
