Keller Heavenly Water System Improvements
2 Documents in Project
Summary
SCH Number
2018068125
Public Agency
South Tahoe Public Utility District
Document Title
Keller Heavenly Water System Improvements
Document Type
NOE - Notice of Exemption
Received
Posted
7/23/2021
Document Description
The Project includes construction of 500 feet (ft) of a new water pipeline
connecting Regina Road to Needle Peak Road and 1,800 ft of new water pipeline from the Keller tank site to the upper intersection of Saddle and Keller. The Project also includes a150,000-gallon replacement tank, tank rehabilitation, and site improvements that involve installation of new wire mesh and a rock fall barrier at the Heavenly Valley access area and the tank area. Backup power and a new Supervisory Control and Data Acquisitions system will be installed along with and pressure reducing valve upgrades will be installed at Saddle Road, Keller Road, Regina Road and Wildwood Avenue.
Contact Information
Name
Trevor Coolidge
Agency Name
Senior Engineer – South Tahoe Public Utility District
Contact Types
Lead/Public Agency
Phone
Location
Cities
South Lake Tahoe
Counties
El Dorado
Regions
Citywide
Other Information
Area serviced by the Keller and Heavenly Water Tanks including water mains from Regina Road to Needle Peak Road and from the intersection of Saddle Road and Keller Road, South Lake Tahoe, El Dorado County, CA 96150
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 1: Existing Facilities (California Code of Regulations, title 14, division 6, chapter 3, article 19, section 15301
Reasons for Exemption
The Project qualifies for exemption because it involves operation, repair, maintenance, and minor alteration of existing facilities with no expansion of use. It also involves replacement of existing structures where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced.
County Clerk
El Dorado