Permit No. 19657 – City of Visalia – Kaweah River at Peoples Basin
3 Documents in Project
Summary
SCH Number
2019011060
Lead Agency
City of Visalia
Document Title
Permit No. 19657 – City of Visalia – Kaweah River at Peoples Basin
Document Type
NOD - Notice of Determination
Received
Posted
8/30/2022
Document Description
Approval of Permit No. 19657, under California Code of Regulations, Title 23, Article 3, Section 6, for work within an adopted plan of flood control: To construct a new concrete inlet structure, a new concrete outlet structure, a 355-foot long and 48-inch diameter rubber gasket reinforced concrete pipeline (RGRCP) between the new inlet structure and detention basin, and an 80-foot long and 24-inch diameter RGRCP between the detention basin and new outlet structure to enable the surplus water in the Kaweah River to be temporarily held in the adjacent Peoples Basin. This project is part of a larger effort to reduce the flood risk and to increase the groundwater recharge in the vicinity.
Contact Information
Name
Angela Nguyen-Tan
Agency Name
Central Valley Flood Protection Board
Job Title
Senior Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Visalia
Counties
Tulare
Regions
Southern California
Other Location Info
The project is located within and adjacent to the Kaweah River, approximately 8 miles upstream (east) of the City of Visalia, Tulare County
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Tulare
Final Environmental Document Available at
The environmental document is available to the general public at the lead agency's office. The Central Valley Flood Protection Board's (Board’s) administrative record related to the encroachment permit is available for public review at the Board's office. Please note, the signed NOD is not attached. If you would like to request a signed copy of the NOD, please contact Board staff at: questions@cvflood.ca.gov
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes