2020 Pipeline Replacement Program
    4 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                
                    
                    
                                    
                        
                
            
        
            
        
            
                
                    
                        
                    
                
                
                    
                
                    
                                
            
        
    
        
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
                Summary
                SCH Number
            
            
                2020079025
            
        
                    Lead Agency
            
            
                Valley Center Municipal Water District
                
            
        
                Document Title
            
            2020 Pipeline Replacement Program
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    10/20/2020
                
            
                Document Description
            
            On October 19, 2020, Valley Center Municipal Water District (District) adopted the Final Initial Study Mitigated Negative Declaration (MND) (State Clearinghouse No. 2020079025) and Mitigation Monitoring and Reporting Program, and approved the Pipeline Replacement Program (Program). The Program would address infrastructure deficiencies that have contributed to an increase in the number of pipe breaks and joint failures in recent years. To address these and other deficiencies, the Program would systematically replace or upgrade the infrastructure, identifying and prioritizing the following projects that are to be completed within the next five years:
• WSo15b - Old Castle Road Pipeline
• MW015a - Oat Hill Discharge Pipeline North
• SG022 - Lilac Pala Pump Station Discharge Pipeline
• CV011 - Cole Grade Road Pipeline
• CV018a - Alps Way Culvert Crossing Pipe Replacement
• CV017a-Rock Hill Ranch Road Intertie
• CV012a- Fruitvale Road Valves
• PD0 16 - Hell Hole Creek Joint Repair
• DW001 - Gordon Hill Road
• CV0S0 - Lilac Road Pipeline Upsize
All construction would occur within or adjacent to existing road corridors or within disturbed alignment. The disturbance areas would be limited to the construction phase and all disturbed areas would be restored to preconstruction conditions. Typical excavation depth would range from 3-5 feet below existing grade. All materials and equipment would be staged within the active construction area, within disturbed areas located adjacent to the corridor or at existing District properties located in proximity to the construction area.
        Contact Information
                        Name
                    
                    
                        Wally Grabbe
                    
                
                        Agency Name
                    
                    
                        Valley Center Municipal Water District
                    
                
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    
                        Name
                    
                    
                        Agency Name
                    
                    
                        Valley Center Municipal Water District
                    
                
                        Contact Types
                    
                    
                        Project Applicant
                    
                Location
                    Counties
                
                San Diego
            
                    Other Location Info
                
                
                    The 2020 Pipeline Replacement Program is comprised of 10 individual projects located throughout the Valley Center Municipal Water District service area. See Attachment 1.
                
            Notice of Determination
                        Approving Agency
                    
                    
                        Valley Center Municipal Water District
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            No
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            Yes
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            No
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    