Manteca Self Storage Project

2 Documents in Project

Summary

SCH Number
2021060077
Lead Agency
City of Manteca
Document Title
Manteca Self Storage Project
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2022
Document Description
The 5.64-acre Project site (Project site) is located at 2430 West Atherton Drive (APN: 241-320-57). This project is bordered to the north and east by West Atherton Drive, and to the south and east by existing residences. Additionally, Bella Terra Drive abuts a portion of the southern boundary of the Project site from the south, (perpendicular to the southern boundary of the Project site). The Project site is currently vacant, containing ruderal grasses. The Project site is generally flat, with an elevation range for the entire Project site of approximately 23 to 28 feet above sea level.

Contact Information

Name
Toben Barnum
Agency Name
City of Manteca
Job Title
Assistant Planner
Contact Types
Lead/Public Agency

Location

Cities
Manteca
Counties
San Joaquin
Regions
Northern California
Cross Streets
Atherton Drive; Bella Terra Drive
Zip
95337
Total Acres
5.64
Parcel #
241-320-57
State Highways
120
Railways
UPRR
Airports
N/A
Schools
Sequoia Elementary School; Veritas School; Brock Elliot Element.
Waterways
N/A
Township
N/A
Range
N/A
Section
N/A
Base
N/A

Notice of Determination

Approving Agency
City of Manteca
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Joaquin
Final Environmental Document Available at
City of Manteca, Development Services Department, 1215 West Center Street, Suite 201, Manteca, CA 95337

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search Print