2022 Air Quality Management Plan
    4 Documents in Project
    
        
            
        
            
        
            
        
            
        
            
                
            
        
            
                
                
            
    
    
            
                
                    
                
                    
                    
                        
                
                    
                    
                                    
                        
                                    
                        
            
        
    
        
            
                
            
                
            
                
    
        
        
            
                
                    
                    
                        
                                    
                        
                            
                        
                    
                                    
                        
                    
                        
            
        
        
            
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
                    
                        
            
        
                Summary
                SCH Number
            
            
                2022050287
            
        
                    Lead Agency
            
            
                South Coast Air Quality Management District
                
            
        
                Document Title
            
            2022 Air Quality Management Plan
        
                Document Type
            
            
                NOD - Notice of Determination
            
        
                Received
            
            
                    Posted
                
                
                    12/6/2022
                
            
                Document Description
            
            The 2022 AQMP is the planning document that sets forth policies and measures to achieve federal and state ambient air quality standards in the region. In accordance with the United States Environmental Protection Agency strengthening the National Ambient Air Quality Standard (NAAQS) for ground-level 8-hour ozone in 2015, by lowering the primary and secondary 8-hour ozone standard to 70 parts per billion, the 2022 AQMP identifies control measures and strategies which have been developed to bring the South Coast Air Basin and the Coachella Valley into attainment with this standard by 2037. The 2022 AQMP control measures and strategies were developed to achieve this NAAQS by focusing on reducing emissions of nitrogen oxides (NOx), which are precursors to the formation of ozone, and other air pollutants. The 2022 AQMP is comprised of the following control measures which address stationary point and area and mobile sources: 1) the South Coast AQMD’s Stationary and Mobile Source Control Measures; 2) control measures identified in the 2022 State Strategy for the State Implementation Plan by the California Air Resources Board; and 3) approved Regional Transportation Plan/Sustainable Communities Strategy and Transportation Control Measures provided by the Southern California Association of Governments. The 2022 AQMP also includes emission inventories, the most current air quality data, updated growth projections, new modeling techniques, demonstrations of compliance with state and federal Clean Air Act requirements, and an adoption and implementation schedule for the control strategies. The 2022 AQMP is designed to protect and improve public health for those living, working, and visiting the region within South Coast AQMD’s jurisdiction.  The 2022 AQMP is estimated to reduce NOx emissions by approximately 124 tons per day beyond implementation of existing regulations. The Final Program EIR for the 2022 AQMP identified the following environmental topic areas would have significant and unavoidable adverse impacts: 1) air quality during construction; 2) energy due to increased electricity, natural gas, and hydrogen demand; 3) hazards and hazardous materials due to accidental release of ammonia, natural gas via pipeline, and liquified natural gas via on-road trucks; 4) hydrology (water demand and water supply) and water quality; 5) construction noise and vibration at roadways; and 6) solid and hazardous waste from construction and early retirement of equipment.
        Contact Information
                        Name
                    
                    
                        Kevin Ni
                    
                
                        Agency Name
                    
                    
                        South Coast AQMD
                    
                
                            Job Title
                        
                        
                            Air Quality Specialist
                        
                    
                        Contact Types
                    
                    
                        Lead/Public Agency
                    
                
                            Phone
                        
                        
                    
                            Email
                        
                        
                    Location
                    Counties
                
                Los Angeles, Orange, Riverside, San Bernardino
            
                    Regions
                
                Countywide
            
                    Other Information
                
                
                    The project is located in the South Coast AQMD’s jurisdiction, which includes the four-county South Coast Air Basin (all of Orange County and the non-desert portions of Los Angeles, Riverside, and San Bernardino Counties), and the Riverside County portion of the Salton Sea Air Basin and the non-Palo Verde, Riverside County portion of the Mojave Desert Air Basin.
                
            Notice of Determination
                        Approving Agency
                    
                    
                        South Coast AQMD
                    
                
                            Approving Agency Role
                        
                        
                            Lead Agency
                        
                    
                            Approved On
                        
                        
                            County Clerks
                        
                        Los Angeles, Orange, Riverside, San Bernardino
                    
                            Final Environmental Document Available at
                        
                        
                            The Final Program EIR, Findings, Statement of Overriding Considerations, and Mitigation, Monitoring, and Reporting Plan is available at http://www.aqmd.gov/home/research/documents-reports/lead-agency-scaqmd-projects.
                        
                    Determinations
                            (1) The project will have a significant impact on the environment
                        
                        
                            Yes
                        
                    
                            (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    
                            (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
                        
                        
                            No
                        
                    
                            (3) Mitigated measures were made a condition of the approval of the project
                        
                        
                            Yes
                        
                    
                            (4) A mitigation reporting or monitoring plan was adopted for this project
                        
                        
                            Yes
                        
                    
                            (5) A Statement of Overriding Considerations was adopted for this project
                        
                        
                            Yes
                        
                    
                            (6) Findings were made pursuant to the provisions of CEQA
                        
                        
                            Yes
                        
                    