SCH Number 2014101015
Project Info
- Title
- Park Avenue Bridge Replacement Project
- Description
- The proposed project would consist of the demolition of the existing Park Avenue Bridge, and construction of an improved seismically-reinforced bridge over the Grand Canal. The new bridge would include 11-foot vehicle lanes, 6-foot raised sidewalks, and ADA-compliant switchback ramps. To maintain access to Balboa Island and Little Balboa Island during construction activities, the project would consist of the installation of a temporary bridge over the Grand Canal at Balboa Avenue, which would allow for demolition of the entire Park Avenue Bridge at one time and reconstruction in a single phase.
2 documents in project