SCH Number 2018031068
Project Info
- Title
- Twain Main Portable Campus Project
- Description
- The proposed project includes the installation of 13 portable and relocatable classroom buildings, one portable administration building, and one relocatable restroom building on the Twain Main campus. Additional site work includes the provision of asphalt pads/foundations and all utilities for each portable and relocatable building, as well as minor trenching for utility connections. The portable and relocatable buildings would accommodate a new charter high school with an enrollment of approx.. 380 students at buildout on a portion of the existing Twain Main campus. No changes to the student enrollment or capacity of the Twain Main campus would occur.
2 documents in project