SCH Number 2018031071
Project Info
- Title
- Earthrise Nutrionals, LLC's Evaporation Pond 8 Project, Calipatria Facility
- Description
- The proposed project consists of the construction, operation, and maintenance of a new, lined evaporation pond at the microalgae production facility owned/operated by Earthrise Nutritionals. The pond will be built on the applicant's 189-acre existing facility and will be used to receive wastewater generated by the harvesting of algae from the Spirulina Harvest Plant Facility and its Linablue Extraction Facility. The SHPF and LBEF are also located at the project site. The annual wastewater discharged to the Pond from the two processes will be approx 16.6 M gallons.
2 documents in project
Type | Lead/Public Agency | Received | Title |
---|---|---|---|
NOD | Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert | Earthrise Nutrionals, LLC's Evaporation Pond 8 Project, Calipatria Facility | |
MND | Regional Water Quality Control Board, Region 7 (Colorado River Basin), Palm Desert | Earthrise Nutrionals, LLC's Evaporation Pond 8 Project, Calipatria Facility |